Construction of the Burgweinting motorway bridge

Unterseite einer im Bau befindlichen Autobahnbrücke mit Gerüsten, einem Aufzug und Stromleitungen für die Bahn darunter
Location Burgweinting, A3 near Regensburg, Germany
Project Duration Finalised 2023
Industry Infrastructure Transportation
Client German federal Autobahn GmbH, South Bavaria subsidiary

The approximately 200-m-long Burgweinting motorway bridge, completed in 1965, which spans long-distance railway lines and the Regensburg-Ost marshalling yard, is the key structure in the six-lane expansion of the A3 ‘European motorway’ near Regensburg.

Obermeyer was commissioned, as part of an engineering consortium, to provide overall construction management and supervision of structural engineering, transport infrastructure and railway construction.

For each carriageway, a sub-structure was constructed using a composite steel structure with two trapezoidal steel girders each, which were installed in four stages.

The replacement construction of the two sub-structures, which was extremely challenging from a technical, operational and construction logistics perspective, was carried out entirely over railway tracks and overhead line systems that remained in operation. A special form of the incremental launching method was used for the construction. First, the new steel components were connected to the old steel framework. The new bridge was then slid into position longitudinally over the tracks, whilst the old bridge was pushed out. A total displacement weight of 1,680 tonnes had to be moved in the process.

The project also included the renewal and widening of the motorway carriageway, along with the associated infrastructure and traffic safety works.

Since completion by the end of 2023, all traffic has been running on six-lanes across the two new structures.

Construction site with extensive formwork and steel shoring around a deep excavation
Aerial view of motorway construction beside active traffic, with bridge deck formwork and earthworks in a rural landscape
Bridge construction site with steel columns, cranes, workers, and road deck surfacing
200 mLength of motorway bridge
1,680 tonnesTotal displacement weight during bridge launching
6 lanesMotorway capacity after expansion
Completed end of 2023Project completion

Technical Specifications

Structural system Composite steel bridge structure with trapezoidal steel girders
Bridge construction method Incremental launching method (special variant)
Construction under operation conditions Bridge replacement over live railway tracks and overhead lines
Associated transport infrastructure works Renewal and widening of motorway carriageway
Baustelle mit umfangreichen Schalungs- und Abstützarbeiten rund um ein Betonbauwerk
Bauarbeiter, die ein großes Stahlbrückenelement auf Gerüsten und provisorischen Stützen ausrichten
Stahlbrückenträger im Bau über Eisenbahnschienen, mit Kran, Gerüst und Arbeitern vor Ort
Luftaufnahme von Autobahnbauarbeiten neben dem fließenden Verkehr, mit Brückenbauarbeiten und Erdarbeiten über Eisenbahnschienen
Baustelle einer Straßenbrücke mit Stahlpfeilern, Arbeitern, einem Kran und Fahrzeugen unter blauem Himmel
Unterseite einer im Bau befindlichen Betonbrücke mit Gerüsten, einer Hubarbeitsbühne und Baustellenfahrzeugen
Brückendeck im Bau mit roter Schalung, Gerüsten und einem Turmkran

We're here to help you build better.