Railway Technical Base in Dakar, Senegal

Location Senegal
Project Duration 2018 – 2019
Industry Infrastructure Transportation
Client Eiffage Rail / Yapi Merkezi S.A.

Technical base facilities along railway line Dakar-Diamniadio-AIBD (Blaise Diagne International Airport) of the Regional Express Train (TER), Senegal

Technical Details

The project involves the construction of the Technical Base for a new high-speed railway line in Senegal, connecting the city of Dakar with the new international airport of Dakar, the Blaise Diagne International Airport. The technical base comprises two building complexes with a total of 10 buildings for the maintenance, repair, cleaning and storage of the rolling stock, systems control and also for the administration (offices), with a total GFA of approximately 25,000 m².

Rail vehicle under construction in a large industrial hall with overhead cranes and a mobile boom lift
Industrial hall interior with steel frame, overhead crane, and open concrete floor
Railway yard with tracks, red industrial buildings, and a train at the platform
Architectural rendering of an industrial complex with buildings, rail tracks, roads, and parking areas

Services Provided

The scope of services includes the elaboration of the detailed architectural, fire safety, structural and mechanical design of 10 buildings, the detailed road – parking and drainage design.

The design of the main maintenance building is executed in BIM environment, due to its complexity in terms of structure, equipment and networks, to ensure coordination between disciplines.

The design team adhered to the requirements of the construction site and adjusted the designs according to the incoming information from the construction site.

Rail yard with multiple tracks beside large industrial warehouse buildings and surrounding homes
Rail depot with multiple trains under maintenance, overhead gantry crane, and elevated walkways
BIM visualisation of an industrial building interior with steel framing and service shafts
Aerial view of a large industrial building with sawtooth roof and adjacent rail vehicles on site
2Building Complexes
10Buildings
Approx. 25,000 m²Gross Floor Area

Technical Specifications

Project Environment BIM-based design for the main maintenance building
Design Scope Architectural, fire safety, structural and mechanical design, road, parking and drainage desig
Facility Use Maintenance, repair, cleaning and storage of rolling stock, systems control and administration
Gross Floor Area Approx. 25,000 m²
No. of Buildings / Building Complexes 10 / 2

We're here to help you build better.