Achillion Building Complex in Corfu, Greece

Neoclassical villa facade with columns, balconies, statues, and surrounding trees
Location Corfu, Greece
Project Duration 2015–2016
Industry Buildings
Client Hellenic Public Properties Company

Preservation and enhancement of uses of the monumental Achillion building complex and surrounding areas in Corfu

Technical Details

Preservation of the monumental building complex and extensive gardens, which originally served as the summer residence of the Empress Sissy. The building complex, including the palace, the old barracks and stables, the entrance building, and the gardens is listed as a monument and is a museum of itself, with only part of the facilities open to the visitors, due to the deteriorating status of the facilities. The project program envisages the complete preservation of the buildings, the expansion of the visitors’ access and the enhancement of its operation with additional museum and other cultural activities, such as exhibition areas, restaurant, coffee shops, educational spaces etc.

Architectural elevation of a neoclassical building facade with retaining wall section
Site plan showing a hilly terrain layout with outlined construction zones and buildings

Obermeyer’s assignment embraces the provision of architectural and structural design services. All interventions to the monumental buildings are under consideration of the strict preservation guidelines internationally applied to monuments. All designs are subject to the approval of the Central Council for Contemporary Monuments. The total buildings’ GFA is 6,000 m² and the surrounding area 8,800 m², including a monumental marble stair axis, with a length of 300m.

Circular pavilion with columns and statue on a stone terrace in a wooded park
Classical building facade with statues and ornate balcony railings

Services Provided

The scope of services includes five main stages for both the architectural and the structural design assigned to OBERMEYER: documentation (historical/photographic, architectural, and structural, including materials verification), preliminary, final and detailed design and tender documentation. Furthermore, OBERMEYER acted as the coordinator for all disciplines, including also electrical, mechanical, environmental design and Health & Safety

All interventions to the monumental buildings are under consideration of the strict preservation guidelines internationally applied to monuments. All designs were approved by the Central Council for Contemporary Monuments.

Ornate interior staircase with painted walls and a large horse mural under a skylight
ornate interior staircase with red carpet and decorative iron railings
ornate historic lobby with central staircase and columns
Colonnaded building with a checkered stone courtyard and trees
Approx. 6,000 m²Gross Floor Area
Approx. 300 mMonumental Marble Staircase

Technical Specifications

Project Scope Conservation, restoration and adaptive reuse of the Achillion Palace complex and surrounding estate
Conservation Approach Design in accordance with internationally recognised heritage conservation principles
Approval Process All design stages approved by the Central Council for Contemporary Monuments