Athens Metro Line 4

Deep excavation for metro tunnel works with cranes, a TBM, and adjacent urban buildings at dusk
Location Athens, Greece
Project Duration 2021 – 2032
Industry Infrastructure Transportation
Client AVAX S.A. , GHELLA Spa and ALSTOM TRANSPORT S.A.

Obermeyer was appointed by the Design and Build Contractor as the nominated Consultant for Geotechnical Evaluation, Temporary Excavation Support Design, TBM Tunnel Design, NATM Tunnel Works Design, Architectural and Structural Design of Stations / Shafts. The scope included the provision of geotechnical, tunnel, architectural and structural engineering services for all stations, shafts, and associated structures. Designs in BIM environment.

Section Α’ “Alsos Veikou – Goudi” has been planned so as to serve several densely populated areas of Athens, as well as important buildings and facilities such as hospitals, educational institutions, courthouses, and buildings of public organizations or ministries.

The geotechnical engineering services encompass:

  • Elaboration of geotechnical reports and interpretative models to characterize ground conditions as well as geotechnical risk assessment.
  • Reports on the Evaluation of Geotechnical Design Parameters
  • TBM Tunnels Interstations Designs
  • Design of TBM Tunnel Precast Concrete Lining Segments
  • TBM Tunnels Back Analyses
  • Designs of TBM Tunnel Interfaces
  • Final Designs and Detailed Designs and analysis of Temporary Structures for 8 NATM / C&C Stations (retaining system of stations, shafts etc.) a major forestation and a ventilation shaft.
  • Final Designs and Detailed Designs and analysis of metro tunnels bored using conventional mechanical means (355m long, triple-track)
  • Detailed designs of associated works (steel struts, retaining walls, tunnel linings etc.)
  • Estimation of ground settlements and displacements due to deep excavations and tunneling works in urban environment. 

The architectural engineering services encompass:

  • Final Designs and Detailed Designs of architectural works and architectural finishes of buildings/structures for 6 metro stations a major forestation and ventilation shaft including:

    • Operational layouts of stations and buildings
    • Horizontal and vertical connections (corridors, escalators/staircases, lifts, emergency exits) ensuring, on the one hand, the smooth passenger flow and, on the other hand, the evacuation of stations and buildings in emergencies.
    • Architectural finishes on the floors (including provisions for PWD), masonry walls, roofs, balustrades, handrails, exterior surfaces of stations, entrances, shafts, crossovers and buildings
    • Reinstatement and configuration of the surfaces at street level at the locations of worksites
    • Operation equipment for the Station Master Rooms and the personnel areas in station

The structural engineering services encompass:

  • Final Designs and Detailed Designs of permanent structures, such as Tunnels, Stations, Shafts and Depot buildings for 6 metro stations a major forestation and ventilation shaft.
  • Waterproofing Designs and installation schemes
Nighttime open excavation with high retaining walls, tunnel portal, crane, and construction machinery
"Veikou" Forestation Shaft Temporary Retaining Support
Steel-framed shaft interior with cross braces and a bright opening above
"EYDAP" Shaft Temporary Retaining Support
Aerial view of a deep excavation site with excavators, dump trucks, and retaining walls beside buildings
"Veikou" Station Temporary Retaining Support
Aerial view of an urban excavation pit with an excavator and cranes beside a road.
"Galatsi" Station Temporary Retaining Support
Workers pouring concrete inside a tunnel under construction
TBM Tunnel Finishing Works
Tunnel boring machine embedded in excavation shaft with mud and exposed concrete wall
TBM "Athena" Breakthrough

Technical details:

  • Total TBM double track tunnel length 10,300 m, EPB TBM bore diameter 9.52 m
  • 4- or 5- or 6- or 7- level metro stations being constructed using a mixed construction method (Platform level bored using conventional means (NATM), while remaining sections of station and entrances constructed using the Cut and Cover method

    • Side-platform NATM tunnels ~80 m long, net inner width >15.00m
    • Crossover tunnels, entrance tunnels, stairs/escalators tunnels, ventilation tunnels
    • Entrance and Ventilation Cut and Cover shafts
  • 5-level Cut-and-Cover Maintenance Forestation 215.80 m long – inner dimension, 13.8 m to 28.7 m wide, 35 m deep
  • Triple-track Forestation Tunnel, 295m long, net inner width 14.30 m
  • Trumpet Tunnel, 59m long, maximum net inner width 13.87 m
  • Shaft for Ventilation, emergency exit and recess for traction power switchgear

Aerial view of a tower crane over an urban construction pit beside a street
"Alexandras" Station Temporary Retaining Support
Urban excavation pit with crane, retaining walls, workers, and machinery between apartment buildings
"Alexandras" Station Temporary Retaining Support - Struts
Excavator and worker inside a rock tunnel under construction with a large ventilation pipe overhead
"Veikou" Forestation Tunnel - NATM Works
Tunnel excavation site with concrete retaining walls, arched portal, workers, machinery, and earth pile
"Veikou" Forestation Tunnel - Portal
10,300 mTBM double track tunnel total length
9.52 mTBM Diameter
8No. of stations (Temporary Support Designs)
6No. of stations (Architectural & Structural Designs)
355 mNATM tunnel total length

Technical Specifications

Design Phases General Final Design (GFD) & Detailed Final Design (DFD)
Civil Works – Geological, Geotechnical, and Structural Designs Geological/geotechnical survey reports, temporary retaining/supporting structures (e.g., piles, struts, anchors), geomechanical/structural monitoring (GSM), and permanent structures (stations, tunnels, shafts, Depot workshop) including waterproofing
Architectural Designs Station and shaft layout, architectural finishes, surface restoration, and urban integration
Building Information Modeling (BIM) Implementation of BIM across the full lifecycle of Line 4 to enhance design quality, improve stakeholder collaboration, and facilitate long-term operation and maintenance