Cross-border Road Bridge “Kipi – Ipsala”, Greek-Turkish border

Cable-stayed bridge over a river
Location Greek–Turkish border
Project Duration 2023 – 2025
Industry Infrastructure Transportation
Client Egnatia Odos S.A.

Checking of Final Design of the 2nd Cross-border Road Bridge in the area of the border crossing “Kipi – Ipsala”

Technical Details

The project concerns the new cross-border road bridge “Kipi – Ipsala”, located at the Greek-Turkish border. The bridge is part of the “European Transport Corridor Thessaloniki – Istanbul”, constructed on the frame of the agreement between Greece and Turkey. The bridge superstructure’s width is 34 m and the total length is 841 m.

Two discrete structural configurations are identified:

– The main, extradosed 3-spanned bridge of total length 400 m, above “Evros” river. The superstructure consists of 2 prestressed reinforced concrete, parallel box girders, transversely interconnected with crossbeams. A concrete slab connects the box girders.

– 2 access bridges of a length of 150 m on the Greek side and 291 m on the Turkish side. Both bridges are constructed of precast pre-tensioned T-beams within situ concrete slab.

The superstructure of the main bridge is supported on 2 pylons, symmetrically positioned on both sides of the borderline. The designed deep pile – foundation secures stability.

Cable-stayed bridge with multiple traffic lanes and vehicles under a partly cloudy sky
Cable-stayed bridge over a river with traffic on the deck
Services Provided

Obermeyer Hellas was assigned the checking of the final design in 2 stages. Obermeyer Hellas also supported Egnatia Odos by participating in the Joint Planning and Monitoring Project Committee (JPMPC) meeting. Obermeyer formally approved the design for implementation in 2025.

Architectural elevation of a cable-stayed bridge with a single central pylon
Technical drawing of a multi-span bridge cross-section with support piers and dimensions
Technical drawing of a bridge cross section with dimensions and structural details
Technical drawing of a cable-stayed bridge pylon cross section and elevation

841 mTotal Bridge Length
400 mMain Bridge Length
150 mGreek Access Bridge
291 mTurkish Access Bridge
34 mBridge Width
3Main Bridge Spans

Technical Specifications

Bridge Type Extradosed main bridge with two approach bridges
Main Superstructure Two parallel prestressed reinforced-concrete box girders connected by crossbeams and a concrete deck slab
Access Bridge Structure Precast, prestressed T-beams with in-situ concrete deck slabs
Pylons Two pylons positioned symmetrically on either side of the Greek–Turkish border
Foundation System Deep pile foundations
Project Framework Bilateral infrastructure project between Greece and Turkey
Review Scope Two-stage final design review and formal approval for construction