Emergency Department and Footbridge at the General University Hospital of Patras, Rio, Greece

Architectural rendering of a hospital emergency department entrance with people outside
Location Patras, Greece
Project Duration 2023 – 2025
Industry Buildings
Client 6th Health District of Peloponnese, Ionian Islands, Epirus and Western Greece / JV Resinvest–Bakalaros

Expansion and reconfiguration/renovation of the existing Emergency Department and new pedestrian bridge at General University Hospital of Patras in Greece

Technical Details

The project involves targeted interventions at the General University Hospital of Patras in the aera of Rio. The project comprises two key components:  the expansion of the existing Emergency Department (ED) and the construction of a new pedestrian bridge.

As a 700-bed tertiary care facility and one of the largest hospitals in the country, the hospital serves over 300,000 individuals annually. The existing ED operates on a 24-hour basis during the hospital’s designated general on-call days, i.e., four days per week, and receives approximately 500 cases per day. In total, the Emergency Department is visited by approximately 2,000 individuals on a weekly basis.

The first sub-project involves the horizontal expansion of the existing Emergency Department by approximately 1,000 m² along with the necessary internal reconfigurations and renovations to the existing building to ensure the seamless integration of the new extension with the current facility and to also meet the new architectural and functional program requirements. The objective is to increase the functional area of the Emergency Department, thereby enhancing its capacity and efficiency in line with current patient throughput and functional demands. The architectural approach for the building addition is based on its subtle integration – both volumetrically and morphologically – into the dominant architectural ensemble of the hospital.

The second sub-project involves the construction of an enclosed pedestrian bridge to provide a direct, safe, and weather-protected connection between the hospital and the university. The bridge is arranged in an L-shaped layout, comprising two fully enclosed elevated corridors joined at an intermediate vertical circulation core with an escape staircase and an elevator. The structural system of the corridors consists of steel trusses, 4 per corridor, and a composite floor slab whereas the circulation core is a reinforced concrete structure. The design ensures efficient and comfortable movement of staff between workspaces while meeting all safety, accessibility, and operational standards.

Both sub-projects require extensive modifications to the internal road network to ensure efficient vehicular circulation, adequate parking provision, and unobstructed pedestrian access, with priority given to ambulance routes and emergency vehicle access.

Architectural rendering of a hospital emergency entrance and parking area
Emergency Department Expansion Front View
Architectural rendering of a low-rise building with two people reviewing plans outside
Emergency Department Expansion Back View

Services Provided

The scope of services includes three main stages for the architectural and structural design assigned to Obermeyer: preliminary, final (permit) and detailed design. Furthermore, Obermeyer prepared the health & safety and signage study and acted as a leading team member within a multi-disciplinary team.

Architectural rendering of a blue enclosed pedestrian bridge between industrial buildings
Pedestrian Bridge View
BIM visualisation of a steel truss tower crane with a concrete base
Pedestrian Bridge Structural Model
700 bedsHospital Capacity
More than 300,000 peopleAnnual Population Served
Approx. 2,000 per weekEmergency Department Visits
Approx. 1,000 m²Emergency Department Expansion

Technical Specifications

Project Scope Expansion and refurbishment of the existing Emergency Department and construction of a new enclosed pedestrian bridge
Bridge Configuration L-shaped layout with two elevated enclosed corridors
Bridge Structure Steel trusses with composite floor slabs
Circulation Core Reinforced concrete structure with escape staircase and lift
Hospital Integration Architectural integration of the new extension into the existing hospital complex
Access and Circulation Modifications to the internal road network, parking areas, pedestrian routes and ambulance access
Design Stages Preliminary, final and detailed design
Supporting Requirements Accessibility, health and safety, signage and emergency vehicle access