Tunnel Lobau

Project duration from 2007 to 2027

Client
Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFiNAG)

Location
Wien, AT

The S1 outer ring express road is the gap closure in the freeway and express road ring around Vienna. The centerpiece of this gap closure is the Lobau Tunnel with a length of approx. 8.3 km, 5,980 m of which is in shield construction. The Lobau Tunnel consists of two parallel tunnel tubes, each with a tunnel diameter of 15 m, underneath the Danube and the Donau-Auen National Park. The two tunnel tubes are connected by a total of 28 cross passages, which are constructed in the shotcrete method under the protection of an all-round freezing system.

Completion is scheduled for 2026.

OBERMEYER was commissioned as a member of a joint venture with the work phases submission planning, tender design, invitation to tender and detailed design.