• de
  • en
OBERMEYER Gruppe
  • back to corporate group

OBERMEYER Infrastructure

OBERMEYER Infrastructure

  • About us
  • Management
  • Services
    • Electro-mobility
    • Site development
    • Airports
    • Construction engineering
    • German Institute for Environmental Protection and Building Physics
    • German Institute for Transport Planning & Technology
    • Project controlling
    • Test routes for the automotive industry
    • Rail
    • Trams
    • Road
    • Power lines for high-voltage transmission
    • Technical equipment, transport
    • Transport stations
    • Water
  • References
  • Contact
  • OBERMEYER
  • Companies
  • OBERMEYER Infrastructure
  • References

Projects of OBERMEYER Infrastruktur

OBERMEYER Infastruktur provides property developers with professional, customer-facing support throughout all phases of a project. The following references provide a selection of successfully completed or current projects, and they document the multi-faceted service sectors of this company in practice.

ABS 36 Brenner North Access Route Planning Sections PA1 and PA3

ABS 36 Brenner North Access Route Planning Sections PA1 and PA3

Upper Bavaria

S-Bahn Line S21 Northern Connection, Berlin Central Station – Potsdamer Platz

S-Bahn Line S21 Northern Connection, Berlin Central Station – Potsdamer Platz

Berlin, DE

New-build and relocation of the motorway bridge at Burgweinting

New-build and relocation of the motorway bridge at Burgweinting

Burgweinting, A3 near Regensburg, DE

ABS/NBS Karlsruhe–Basel – ‘Offenburg Tunnel’

ABS/NBS Karlsruhe–Basel – ‘Offenburg Tunnel’

Offenburg, Baden-Württemberg, DE

High-speed railway linking Ebensfeld–Erfurt

High-speed railway linking Ebensfeld–Erfurt

DE

Floodwater protection, Balzhausen/Bayersried

Floodwater protection, Balzhausen/Bayersried

Balzhausen, DE

Aschaffenburg ring road: A main road through the city centre

Aschaffenburg ring road: A main road through the city centre

Aschaffenburg, DE

Expansion of the Munich Trade Fair, Halls C5 and C6

Expansion of the Munich Trade Fair, Halls C5 and C6

Munich, DE

Renovation of the Petersberg tunnel

Renovation of the Petersberg tunnel

Neef a.d. Mosel, DE

Variant comparison for the Fehmarn-Sund submerged tunnel crossing

Variant comparison for the Fehmarn-Sund submerged tunnel crossing

Fehmarn, DE

Sludge digestion plant Sindlingen

Sludge digestion plant Sindlingen

Frankfurt, DE

Sewer simulation and calculation of pollution load Ulm-Süd

Sewer simulation and calculation of pollution load Ulm-Süd

Ulm, DE

123Next
Proudly powered by WordPress
Certificate logo ISO 9001
  • LkSG
  • Whistleblower System
  • Legal notice
  • Data protection
  • Contact